箱涵基坑支護(hù)技術(shù)交底.doc

更新時間: 2024-02-23
下載權(quán)限: 免費會員
文件大。 0.01 MB
文件類型: .doc
瀏覽次數(shù):
上傳會員: 382957161
所屬欄目: 巖土技術(shù)交底
進(jìn)入下載頁
資料簡介

交底內(nèi)容:
1. 對實際開挖深度≤5.0m地段的基坑,上面1.2m采用1:1放坡,坡面噴射C15混凝土硬化層,下面采用拉森鋼板樁支護(hù);若遇到相對較差土層,采用密排拉森鋼板樁支護(hù)。鋼板樁頂設(shè)一道支撐,支撐選用32號雙翼工字鋼。
2. 對實際開挖深度>5.0m地段的基坑,采用密排鋼板樁支護(hù),樁頂以下0.5m設(shè)一道支撐,支撐選用32號雙翼工字鋼,水平間距不大于4.0m。
3. 施工過程中要加強(qiáng)對基坑的監(jiān)測,每隔20.0m設(shè)一個沉降和位移觀測點,發(fā)現(xiàn)有異常情況時及時采取應(yīng)急處理措施,如采取回填反壓土或坑頂卸土的方法。
4. 基坑降水采用井點降水,保證水位在坑底以下0.5m;施工過程要做好排水工作,坑底、坑頂均應(yīng)設(shè)排水溝(400×350)和集水井(1000×1000×800)。
5. 基坑土方開挖采取分段、分層開挖,每層開挖深度不大于1.5m,每段開挖長度小于40.0m?拥滓陨30.0cm土采用人工開挖,以免擾動原狀土。
基坑施工過程中,在2.0m范圍內(nèi)嚴(yán)禁大型載重車輛行走,保證基坑安全;同時基坑周邊應(yīng)設(shè)鋼圍欄。
Cards on the table contents:
1. On the actual excavation site of the excavation depth ≤ 5.0m, 1.2m above the 1:1 cut slope, slope jet C15 concrete hardening, the following support by Larsen sheet pile; If they are in relatively poor soil using closely spaced steel sheet pile retaining Larsen. Set up a steel sheet pile head support wings 32, I-beam support used.
2. On the actual excavation depth> 5.0m lot of excavation, using closely spaced steel sheet piles, pile top the following set up a 0.5m support wings 32, I-beam support used, the horizontal spacing of not more than 4.0m.
3. The construction process should strengthen the foundation of the monitoring, at intervals of 20.0m set up a settlement and displacement of observation point, when an abnormality is detected in time to take contingency measures, such as to backfill compacted soil or pit the top anti-dumping earth approach.
4. Foundation pit dewatering used to ensure the water level at the Bottom of the following 0.5m; the construction process to make the drainage work, pit bottom, pit roof drains should be located (400 × 350) and the set of wells (1000 × 1000 × 800).
5. Earthwork excavation pit to section, layered excavation, excavation depth of each layer is not greater than 1.5m, the length of each piece of excavation is less than 40.0m. Bottom 30.0cm above artificial excavation of soil, undisturbed soil to prevent disturbance.
Foundation construction process, is strictly prohibited in the 2.0m range of large-scale load vehicles to ensure the Pit; the same time should be set steel fence around the pit.
 

下載地址

前往下載

国产性一交一乱一伦一色一情| 九九九精品成人免费视频小说 | 国产精品一区二区三区不卡| 中文字幕乱码亚洲影视| 成人亚洲狠狠一二三四区| 国产精品亚洲精品日韩已满十八小 | 亚洲高清免费在线观看| 亚洲综合色区另类av| 日韩不卡在线观看视频不卡| 久久香蕉国产观看猫咪3atv| 狠狠噜天天噜日日噜色综合| 热久久精品免费视频| 中文字幕一区二区三区久久蜜桃 | 亚洲国产综合自在线另类| 亚洲欧美日韩精品中文乱码| 亚洲成人av在线资源| 中文人妻熟妇精品麻豆| 永久免费无码网站在线观看| 欧美一区二区三区啪啪| 免费超爽大片黄| 国产成人精品视频ⅴa秋霞影院| 一区二区亚洲 av免费| 少妇激情AV一区二区三区| 97久久精品人人澡人人爽| 亚洲精品一区二区三区大桥未久| 亚洲自偷自拍另类小说 | 亚洲色大成永久WW网站| 久久久精品国产精品久久| 使劲快高潮了国语对白在线| 中文字幕aav| 国产丝袜美腿诱惑在线观看| 韩国午夜理伦三级| 亚洲第一视频区| 中文字幕日韩国产精品| 亚洲爆乳WWW无码专区| 成人18+视频在线观看| 色狠狠色婷婷丁香五月| 免费人成视频网站在线| 激情文学人妻中文字幕| 亚洲AV综合一区二区在线观看| 在线观看国产区亚洲一区|