亚洲欧美一区二区不卡精品,国产av一区二区亚洲精品,欧美精品aaa久久久影院,国产成人亚洲精品自产在线,国产精品国产三级国AV,亚洲一区二区高清精品,久久精品免费一区二区三区 ,日韩在线精品观看视频,777米奇色狠狠俺去啦奇米77,日本在线视频www鲁啊鲁

建虎網(wǎng) 節(jié)省時間成本,讓工作學(xué)習(xí)變得更高效!www.xcky8.com

廣州南沙開發(fā)區(qū)黃閣東路工程排水工程安全技術(shù)交底.doc

更新時間: 2024-03-01
下載權(quán)限: 免費會員
文件大小: 0.01 MB
文件類型: .doc
瀏覽次數(shù):
上傳會員: 龍龍
所屬欄目: 安全文明
進(jìn)入下載頁
資料簡介

1、所有進(jìn)入施工現(xiàn)場人員必須正確佩戴安全帽,并禁止外來閑雜人員進(jìn)入施工現(xiàn)場。
2、電工、挖掘機操作手等特殊工程人員必須持證上崗。
3、開挖基坑、管溝當(dāng)深度超過1.5米(含1.5米),必須事先采取支撐防護措施。
4、離坑、溝邊八十厘米內(nèi)或深度二分之一內(nèi),不準(zhǔn)堆放大量材料和設(shè)備等,三米內(nèi)不準(zhǔn)汽車行走,確實因場地限制需堆放材料、設(shè)備的,確保不得超高塌方。
5、不準(zhǔn)在腳手架立柱邊、鋼井架、施工升降機和塔吊基礎(chǔ)邊、開挖溝坑,并注意觀察附近建筑物有無沉降。
6、做好已開挖溝、坑的防護每個工作面,樹立“注意安全”、“當(dāng)心墜落”等安全標(biāo)志牌和夜間紅燈警示。
7、如地下水豐富需抽水,放潛水泵時,不準(zhǔn)先將插頭插進(jìn)插座,不準(zhǔn)先通電,應(yīng)等下方人員上來后,按程序插好插好插座→再合閘通電。抽水后,先拉閘斷電→拔開插頭→提潛水泵→人再下去作業(yè)。嚴(yán)禁人未上來就送電。
8、施工中要防止墜物傷人,吊裝作業(yè)時,吊物垂直下方不得有人。
9、用電設(shè)備須裝設(shè)漏電開關(guān),并在班前試驗其有效性,無效不得使用,夜間施工準(zhǔn)備好照明設(shè)備。
10、現(xiàn)場材料堆放整齊。電纜、電線理順,不得
1, all to the construction site must wear a helmet, and prohibits foreign people without fixed duties to the construction site.
2, electricians, excavators and other special projects manipulator must certificates.
3, excavation pit, trench when the depth of more than 1.5 meters (including 1.5 meters), must be taken to support the protective measures in advance.
4, away from the pits of edge 80 cm depth within one-half or inside, are not allowed to pile up a lot of materials and equipment, vehicles are not allowed to walk within three meters, is indeed due to space limitations should be stacked materials, equipment, and ensure that no high landslide .
5, are not allowed in the side column scaffolding, steel derrick, construction lifts and tower crane base side, open pit trenching and observe whether the settlement of nearby buildings.
6, do have open ditches, pits the protection of each face, establish a "safety", "Beware of falling" and other safety warning signs and red lights at night.
7, such as groundwater pumping be rich, let submersible pump, the first plug inserted into the socket are not allowed not allowed the first power, should such come under the staff, the well plugged according to the procedure and then closing outlet → power. After pumping, first disconnect the plug blackouts → → → submersible pumps were again put down operations. Prohibited person is not up would send electricity.
8, construction materials to prevent fall injuries, lifting operations, the hoist was not perpendicular to the bottom.
9, electrical equipment shall be installed leakage switch, and test their effectiveness in the class before, invalid shall not be used, ready for lighting at night.
10, on-site materials stacked neatly. Cables, wires straighten out, not
 

下載地址

前往下載

国产女人18毛片水真多| 国内揄拍国产精品人妻电影| 四虎永久免费很黄的视频| 亚洲香蕉伊综合在人在线| 老色鬼在线精品视频| 精品国产乱码久久久久久下载| 午夜无码片在线观看影院A| 二级特黄绝大片免费视频大片 | 亚洲AV无码久久久久网站蜜桃| 国产精品伦人一久二久三久| 99精品久久久中文字幕| 日韩色无码一级毛片一区二区-百 青青爽无码视频在线观看 | 国产精品美女一区二三区| 丰满少妇在线观看网站| 国产成人AV一区二区三区在线| 日本一区二区在线播放观看| 美女裸体a级毛片| 视频二区国产精品职场同事| 亚洲av无码精品色午夜| 日本高清中文字幕二区在线| 就国产av一区二区三区天堂| 亚洲日韩欧美在线成人| 国产嫩草精品网亚洲av| 97免费在线观看视频| 三年级在线观看免费观看大全| 丁香五月缴情在线| 无码专区视频中文字幕| 亚洲AV永久无码嘿嘿嘿嘿| 高中女无套中出17p| 国内精品久久久久影院一蜜桃 | 国产va免费精品观看| 五月天香蕉视频国产亚| 自拍亚洲视频在线观看| 欧美精品综合一区二区三区| 岛国av在线播放观看| 中文亚洲欧美日韩无线码| 亚洲成女人图区一区二区| 熟女少妇丰满一区二区| 亚洲精品97久久中文字幕无码| 久久无码av三级| 无码午夜福利免费区久久|