亚洲欧美一区二区不卡精品,国产av一区二区亚洲精品,欧美精品aaa久久久影院,国产成人亚洲精品自产在线,国产精品国产三级国AV,亚洲一区二区高清精品,久久精品免费一区二区三区 ,日韩在线精品观看视频,777米奇色狠狠俺去啦奇米77,日本在线视频www鲁啊鲁

建虎網(wǎng) 節(jié)省時間成本,讓工作學(xué)習(xí)變得更高效!www.xcky8.com

制冷管道保溫技術(shù)交底-北京建工集團(tuán).doc

更新時間: 2024-02-23
下載權(quán)限: 免費會員
文件大小: 0.01 MB
文件類型: .doc
瀏覽次數(shù):
上傳會員: 382957161
所屬欄目: 暖通技術(shù)交底
進(jìn)入下載頁
資料簡介

  1  范圍
    本工藝標(biāo)準(zhǔn)適用于空調(diào)系統(tǒng)中制冷管道的保溫工程。
    2  施工準(zhǔn)備
    2.1  材料及主要機(jī)具:
    2.1.1  保溫材料應(yīng)符合設(shè)計規(guī)定并具有制造廠合格證明或檢驗報告。
    2.1.2  保溫材料有聚氨脂硬質(zhì)(軟質(zhì))泡沫塑料管殼、聚苯乙烯硬質(zhì)(軟質(zhì))泡沫塑料管殼、巖棉管殼等。以上材質(zhì)應(yīng)導(dǎo)熱系數(shù)小,具有一定的強(qiáng)度能承受來自內(nèi)側(cè)和外側(cè)的水濕或氣體滲透,不含有腐蝕性的物質(zhì),不燃或不易燃燒,便于施工。
    2.1.3  保溫材料在貯存、運輸、現(xiàn)場保管過程中應(yīng)不受潮濕及機(jī)械損傷。        2.1.4  手電鉆、刀鋸、布剪子、克絲鉗、改錐、膩子刀、油刷子、抹子、小桶、彎鉤等。
    2.2  作業(yè)條件:
    2.2.1  難燃材料必須對其耐燃性能進(jìn)行驗證,合格后方能使用。
    2.2.2  管道保溫層施工必須在系統(tǒng)壓力試驗檢漏合格,防腐處理結(jié)束后進(jìn)行。
    2.2.3  場地應(yīng)清潔干凈,有良好的照明設(shè)施。冬、雨期施工應(yīng)有防凍防雨雪措施。
    2.2.4  管道支吊架處的不襯墊缺損或漏裝的應(yīng)補(bǔ)齊。儀表接管部件等均已安裝完畢。
    2.2.5  應(yīng)有施工員的書面技術(shù)、質(zhì)量、安全交底。保溫前應(yīng)進(jìn)行隱檢。
    3  操作工藝
    3.1  工藝流程:
 隱檢→一般按絕熱層→防潮層→保護(hù)層 的順序施工→檢驗。
1 Scope
    This technology is applicable to air conditioning systems refrigeration pipe insulation works.
    2 construction preparation
    2.1 Materials and main equipment:
    2.1.1 Insulation materials shall meet the design requirements and have the factory certification or inspection reports.
    2.1.2 Rigid polyurethane insulation materials are (soft) foam shell, polystyrene rigid (soft) foam shell, such as rock wool pipe shell. Material should be smaller than the thermal conductivity, has a certain strength to withstand water wet from the inside and the outside or gas permeability, does not contain corrosive substances, flammable or nonflammable and easy construction.
    2.1.3 heat insulating material in storage, transportation, site storage process should be free from moisture and mechanical damage. 2.1.4 hand drill, saw and knife, cloth scissors, Cutting pliers, screwdrivers, putty knives, oil brush, trowel, small buckets, hooks and so on.
    2.2 Operating conditions:
    2.2.1 of its flame retardant properties of materials must be validated, certified before use.
    2.2.2 Construction of pipe insulation must be qualified in the leak detection system, pressure test, after the end of preservative treatment.
    2.2.3 The site should be clean, have good lighting. Winter, freezing rain on the construction should be measures to prevent rain and snow.
    2.2.4 Pipe Supports Office cushion defect or leak is not installed should be padded. To take over parts of such instruments have been installed.
    2.2.5 Construction workers should have a written technology, quality, safety cards on the table. Insulation should be hidden before the inspection.
    3 Operation Process
    3.1 Process:
 Implicit review → General → damp insulation layer by layer of protection order → Construction → test.
 

下載地址

前往下載

国产精品店无码一区二区三区| 亚洲午夜福利717| 国产亚洲精品久久久999蜜臀| 久久午夜夜伦鲁鲁片不卡| 一区二区在线中文字幕| 亚洲精品日韩在线观看| 亚洲av无码专区在线厂| 一本大道精品视频在线| 男女视频在线一区二区| 国产高清自产拍av在线| 久久国产精品三级av| 这里只有精品在线播放| 国产精品自拍中文字幕| 天天澡天天揉揉AV无码人妻斩 | 久久国产精品老人性| 性视频一区| 大地资源中文在线观看免费版高清| 99视频在线精品免费观看6| 尤物视频在线免费观看| 天天做天天爱夜夜爽女人爽| 色噜噜狠狠色综合成人网| 91视频日本| 小说 亚洲 无码 精品| 亚洲色图视频在线观看网站| 国产裸体美女视频全黄| 国产精品久久久久久久9999| 亚洲va久久久噜噜噜久久狠狠| 91国在线啪精品一区| 亚洲中文字幕人妻系列| 最近中文字幕完整版hd| 五月综合激情婷婷六月| 老鸭窝视频在线观看| 福利一区福利二区看片| 91水蜜桃网站在线观看| 欧美精品V欧洲精品| 久久婷婷六月| 国产欧美在线观看精品一区污| 网友自拍人妻一区二区三区三州| 亚洲国产成人一区二区在线| av亚洲在线一区二区| 亚洲国产精品久久久久秋霞1|