一、工程量清單招標(biāo)用表由下列內(nèi)容組成
1、封面
2、總說(shuō)明
3、分部分項(xiàng)工程量清單
4、措施項(xiàng)目清單
5、其他項(xiàng)目清單
6、招標(biāo)人材料購(gòu)置費(fèi)清單
7、零星工作項(xiàng)目人工單價(jià)清單
8、規(guī)費(fèi)稅金清單
9、需評(píng)審的材料清單
二、工程量清單的編制應(yīng)符合下列規(guī)定
1、工程量清單應(yīng)由招標(biāo)人或其委托的工程造價(jià)咨詢(xún)單位編制。
2、工程量清單表中所有要求簽字、蓋章的地方,必須由規(guī)定的單位和人員簽字、蓋章。
3、總說(shuō)明應(yīng)按下列內(nèi)容填寫(xiě)
(1)工程概況:建設(shè)規(guī)模、工程特征、計(jì)劃工期、施工現(xiàn)場(chǎng)實(shí)際情況、自然地理?xiàng)l件、環(huán)境保護(hù)要求等。
(2)工程招標(biāo)和分包范圍。
(3)工程量清單編制依據(jù)。
(4)工程質(zhì)量、材料、施工等的特殊要求。
(5)其他需要說(shuō)明的問(wèn)題。
4、分部分項(xiàng)工程量清單依據(jù)《計(jì)價(jià)規(guī)范》進(jìn)行編制,《計(jì)價(jià)規(guī)范》未包括的項(xiàng)目,編制人可作相應(yīng)補(bǔ)充,并報(bào)當(dāng)?shù)毓こ淘?br />
First, the tender of quantities formed with the table by the following
1, cover
2 General Information
3, sub Quantities
4, measures the list of items
5, the list of other projects
6, the tenderer materials inventory purchase costs
7, part of the list of work items manually priced
8, the list of fees taxes
9, need to review the list of materials
Second, the preparation of quantities shall meet the following requirements
1, bill of quantity should be tender or his authorized the preparation of engineering cost consultation units.
2 of quantities in the table all the requirements, signed and sealed areas must be provided for units and personnel, signed and sealed.
3 General Information should fill out the following
(1) Project Profile: Building size, construction characteristics, program schedule, the construction site of the actual situation, natural and geographical conditions, environmental protection requirements.
(2) the scope of tendering and subcontracting.
(3) the basis for preparing bill of quantities.
(4) the quality, materials, construction and other special requirements.
(5) Other things need to explain.
4, sub Quantities based on "valuation standard" in preparation, "Valuation Standards" are not included in the project, the preparation may be added accordingly and report to the local works created