綜合管溝模板工程技術(shù)交底.doc
進(jìn)入下載頁(yè)
交底內(nèi)容:
1. 本工程采用建筑夾板作模板,厚度為18mm,構(gòu)造尺寸為長(zhǎng)×寬=980×1800。
2. 模板安裝前應(yīng)在模板表面涂抹脫模劑。
3. 模板安裝前,必須經(jīng)過(guò)正確放樣,檢查無(wú)誤后才立模安裝。
4. 模板必須支撐牢固、穩(wěn)定,無(wú)松動(dòng)、跑模、超標(biāo)準(zhǔn)的變形下沉等現(xiàn)象。模板拼縫平整嚴(yán)密,并采取措施填縫,保證不漏漿,模內(nèi)必須干凈。模板安裝后及時(shí)報(bào)驗(yàn)及澆混凝土。
5. 結(jié)構(gòu)變形縫處的端頭按設(shè)計(jì)要求設(shè)填縫板,填縫板與嵌入式止水帶中心線和變形縫中心線重合并用模板固定牢固。止水帶不能打孔或用鐵釘固定。填縫板的支撐必須牢固,確保不跑模。
6. 墻模板:
(1). 管溝墻鋼筋綁扎完畢經(jīng)驗(yàn)收合格后,隨即清理其周圍雜物,為安裝模板作準(zhǔn)備。
(2). 墻模板由φ48鋼管立檔及100mm×100mm木枋橫檔和φ48mm鋼管斜撐來(lái)支撐固定:先立100mm×100mm木枋橫檔@500mm,然后放φ48mm鋼管立檔@600mm。采用φ48×3.5mm鋼管斜撐固定內(nèi)側(cè)板,斜撐底部采用預(yù)埋鋼筋固定。另外,在基底兩側(cè)預(yù)埋φ48×3.5mm短鋼管,將側(cè)模豎向圍檁與預(yù)埋短鋼管用扣件扣牢,以控制側(cè)模上浮。由于鋼管斜撐長(zhǎng)度較長(zhǎng),為保證斜支撐的穩(wěn)定,要求斜支撐之間進(jìn)行有效的連接。
(3). 在墻軸線及邊線測(cè)量放樣準(zhǔn)確無(wú)誤后,并將模板按組分塊,再開始安裝。模板安裝時(shí),先安裝端部外側(cè)模,經(jīng)吊錘吊直,拉線拉平后,將其固定撐牢,再依次安裝其余內(nèi)側(cè)模待鋼筋等隱蔽驗(yàn)收完成后安裝另一側(cè)模板,同時(shí)安裝、緊收對(duì)拉螺栓、斜撐等并加以固定。
7. 頂板模板:
(轉(zhuǎn)下頁(yè))
Cards on the table contents:
1. This project used as template construction plywood, thickness 18mm, structure size length × width = 980 × 1800.
2. Template installed before release agent coated surface of the template.
3. Template before installation, must be the correct setting out, check and correct before formwork installation.
4. Template to support strong, stable, no loose, running mode, the deformation beyond the standard sink and so on. Template patchwork tight formation, and to take measures to sealing to ensure no leakage pulp, mold must be clean. Templates added after installation, and inspection and pouring concrete Times.
5. Structural deformation joint Department ends the design requirements set by sealing plates, sealing plates and embedded Sealing deformation joint center line center line and re-merged with the template fixed firmly. Sealing can not punch or nail fixed. Sealing plate support must be firm, to ensure that no run-mode.
6. Wall template:
(1). Lashing trench wall steel finish after their acceptance, then clean up around the debris, in preparation for the installation of the template.
(2). Wall template established by the φ48 steel 100mm × 100mm wooden stalls and stalls and φ48mm Fang Wang steel bracing to support fixed: first, Fang Li 100mm × 100mm wooden cross file @ 500mm, then let stand φ48mm steel file @ 600mm. Φ48 × 3.5mm steel tube with a fixed medial plate bracing, bracing the bottom of the use of embedded steel fixed. In addition, embedded in the substrate on both sides of the short pipe φ48 × 3.5mm, the lateral mode with embedded short vertical tube around Purlin Fastener Koulao to control the lateral mode floating. As the length of steel pipe bracing longer oblique support to ensure the stability required for effective oblique connection between the support.
(3). Sideline in the wall axis and the accuracy of measurement after setting out, and the template block by component, and then start the installation. Template installation, first install the lateral end of mold, hammer hanging by hanging straight, pull leveled, it will support its fixed-rate, and then install the rest in turn, concealed inside the steel mold to be acceptance of the other side of the template after the completion of installation, to install , closes the bolt, bracing, and be fixed.
7. Roof template: