土方施工技術交底
一、 施工順序
根據現場土層分布情況,采用分層逐塊開挖,首先修建至棄土區(qū)便道,然如后圖所示,先開挖1號區(qū)(頂面標高為53.00~55.55),開挖至2號區(qū)頂面(頂面標高為52.00~52.34),并修建排水溝與取土便道。然后開挖2號區(qū),開挖至3號區(qū)頂面(頂面標高為49.31~50.46),然后開挖3號區(qū),開挖至4號區(qū)頂面(頂面標高為47.78~48.55),最后由4號區(qū)開挖至43m的標高(因為現在處于雨季,水面標高以至42m左右),待水退以后在挖至規(guī)劃河底標高。挖除的土方轉運至我部租用的當地魏莊村一大小為40畝左右的玉米洼地里。
二、 土方施工
本項工程量為9萬m3左右土方,受于場地限制,準備采用1臺挖機配合兩臺裝載機同時施工,運土設備采用20臺斯太爾自卸汽車進行運輸。施工時每臺設備配備2名操作工人,分兩班倒24小時不間斷施工。每日計劃開挖土方量3000 m3,由于現在正處于濟南的雨季,土層性質黃土為主,含水量高,一遇下雨,整個土方工作面幾天不能進行施工,所走便道遇雨又需修整換填。因此估計工期為45個工作日。
1、 施工技術方案及操作要點
土方開挖邊坡按1:1考慮,土方開挖前首先經由測量放樣,并報監(jiān)理審批后,然后根據開挖深度定出兩邊邊線。開挖時先做好地面排水,開挖1號區(qū)時,運輸車輛停放在2號區(qū)面上,挖機在1號區(qū)頂面由南向北開挖,裝載機在2號區(qū)面上裝運。在K4+700~780范圍修建兩條6m寬取土便道(兩條總長160m),一條上行道,一條下行道。由于土壤性質為含水量大的黃土,在重車碾壓后每隔1小時左右就需裝載機重新修整,因此準備回填30cm厚左右的砂礫在便道上。開挖過程中2號區(qū)面上,裝載機要隨時整
Earthwork Construction Technology Details
First, the construction sequence
According to the distribution of site soil, stratified by blocks of excavation, first of all sidewalk construction to spoil area, however as shown after the first excavation on the 1st District (top elevation of 53.00 ~ 55.55), excavation to 2 District No. top (top surface elevation of 52.00 ~ 52.34), and the construction of drains and dug pavement. And excavation on the 2nd District, Area 3 excavation to the top surface (top surface elevation of 49.31 ~ 50.46), and then excavating the 3rd District, excavation to the 4th District, the top surface (top surface elevation of 47.78 ~ 48.55), excavation from the area last 4 to 43m of elevation (as is now in the rainy season, water surface elevation as well as 42m or so), to be dug to the water withdrawal plan after the river bed elevation. Earthwork excavation of the Department of rent transfer to my local Wei Village, a size of about 40 acres of corn in the hollow.
Second, earthwork construction
The project volume of about 90,000 m3 of earth by the space constraints, prepared by a digging machine with two sets simultaneously loaders, earth moving equipment, 20 sets of used dump truck for transport Steyr. Construction of operation of each device is equipped with two workers in two shifts 24 hours a day construction. Earthwork excavation daily plan 3000 m3, as now in the rainy season in Jinan, mainly loess soil properties, high water content, one case of rain, the earth a few days can not face the construction, the pavement when it rains they go need to trim replacement. Therefore estimated duration of 45 working days.
1, the construction technology program and operating points
Earth excavation slope 1:1 considered by the measurement of earth excavation before the first setting out, and report to Commissioner approval, and then set both sides of the excavation depth edges. When the first good surface drainage excavation, excavation of the 1st District, the transport vehicles parked in the 2nd district level, the digging machine in the 1st District, south to north from the top surface of excavation, loader surface shipment in 2 areas . K4 +700 ~ 780 range in the construction of two 6m wide pavement dug (2 length 160m), an on-way street, a downstream Road. As the nature of the soil water content large loess, after rolling in the heavy vehicle every 1 hour loader would need to re-dressing, so ready to backfill around 30cm thick gravel on the pavement. District No. 2 during the excavation surface, loaders to keep the whole