模板工程安全技術交底.doc
進入下載頁
1、按照施工方案的要求作業(yè);
2、模板安裝按施工設計進行,嚴禁隨意變動,支頂必須有墊塊;
3、上層和下層支柱在同一垂直線上,模板及其支撐系統(tǒng)在安裝過程中,必須設置臨時固定設施;
4、支柱全部安裝完畢后,應及時沿橫向和縱向加設水平平撐和垂直剪刀撐;
5、支柱高度小于4m時,水平撐應設上下兩道,兩道水平撐之間,在縱、橫加設剪刀撐;
6、拆除時嚴格遵守安全規(guī)定,高處、復雜結構模板拆除應有專人指揮,嚴禁非操作人員進入作業(yè)區(qū);
7、拆除的模板,柱桿、支撐要及時運走,妥善堆放;
8、拆除板、梁、柱墻模板,在4m以上的作業(yè)時應搭腳手架或操作平臺,并設防護欄桿,嚴禁在同一垂直面上操作;
9、安裝和拆除柱、墻、梁、板的操作層,從首層以上各層應安裝安全平網(wǎng)。進行拆除作業(yè)時,應設置警示標牌;
10、驗收合格方可進行作業(yè),未經驗收或驗收不合格不準作下一道工序作業(yè)。
1, in accordance with the requirements of the construction program of work;
2, template design for installation by construction, non-random changes in the top branch must have Pad;
3, upper and lower pillar in the same vertical line, the template and the support system during the installation process, you must set up a temporary fixed installations;
4 pillars of all the installation is complete, in time along the horizontal and vertical levels of peace support and additional vertical scissors;
5, pillar height is less than 4m, the level of support should be set up and down two, two between the level of support in the vertical, wanton set scissors;
6, removal of strict compliance with safety requirements, height, remove the template complex structure should hand the command of prohibited non-operators into the work area;
7, removal of the template, pole, support should be promptly removed and properly stacked;
8, removal of panels, beams, columns wall template, operating in more than 4m should be scaffolding or platforms, and set up protective railings, non-operating in the same vertical plane;
9, installation and removal of columns, walls, beams and slabs of operation layer, from the floors above the first floor should be installed Anquan Ping network. Carrying out demolition works should be set up warning signs;
10, acceptance test to be conducted operations, without inspection, or failed the inspection are not allowed to work for the next process.