亚洲欧美一区二区不卡精品,国产av一区二区亚洲精品,欧美精品aaa久久久影院,国产成人亚洲精品自产在线,国产精品国产三级国AV,亚洲一区二区高清精品,久久精品免费一区二区三区 ,日韩在线精品观看视频,777米奇色狠狠俺去啦奇米77,日本在线视频www鲁啊鲁

建虎網(wǎng) 節(jié)省時(shí)間成本,讓工作學(xué)習(xí)變得更高效!www.xcky8.com

吹砂填筑路堤技術(shù)交底.doc

更新時(shí)間: 2024-02-29
下載權(quán)限: 免費(fèi)會(huì)員
文件大。 0.01 MB
文件類型: .doc
瀏覽次數(shù):
上傳會(huì)員: 龍龍
所屬欄目: 路橋技術(shù)交底
進(jìn)入下載頁(yè)
資料簡(jiǎn)介

吹砂填筑路堤技術(shù)交底
一. 一般要求 (一)   材料:
1、中、粗砂為宜,含砂量(即小于74μm的顆粒粒徑)不宜大于10%。     2、片石:采用較大的塊石,一般粒徑不小于0.3m,石料抗壓強(qiáng)度大于20Mpa,未風(fēng)化。 (二)  操作工藝:     1、首先清除場(chǎng)地內(nèi)地表草皮,腐植土以及植物根系,然后對(duì)天然地基進(jìn)行碾壓;要求地面以下1m范圍內(nèi)土基壓實(shí)度(重型)不小于85%。     2、用挖掘機(jī)在路堤坡腳位置挖出臨時(shí)排水溝(施工期間用土質(zhì)邊溝,待路基預(yù)壓期結(jié)束,沉降及側(cè)向位移穩(wěn)定后,再漿砌片石)。     3、對(duì)于攪拌樁路段,完成樁體后鋪碎石墊層,再吹填路基。     4、利用編制砂袋在護(hù)道位置修筑擋水堤,其高度應(yīng)按吹砂高度而定,最少應(yīng)高出吹堤高度30~50cm。擋水堤頂部寬度應(yīng)不小于1m,擋水堤要求堅(jiān)實(shí),不留空洞,要將填砂范圍與路基兩側(cè)農(nóng)田徹底隔離。   5、開(kāi)始吹填工作。每個(gè)吹填區(qū)設(shè)置長(zhǎng)40m的泄水口,設(shè)于圍堰中部,以排出泥水,必要時(shí)可配備抽水機(jī)排水。     6、當(dāng)路堤高度小于2m時(shí),可作一次吹填,當(dāng)路堤高度大于2m時(shí),應(yīng)分層吹填,分層吹填的厚度一般為1-2米。     7、吹填標(biāo)高控制,測(cè)量標(biāo)樁擬30m×30m設(shè)
Blowing sand filling embankment Technology Details
1. General requirements (a) Material:
1, the coarse sand is appropriate, the sand content (that is less than 74μm particle size) should not be greater than 10%. 2, rubble: the larger the stone, the general size not less than 0.3m, stone compressive strength greater than 20Mpa, not weathering. (B) the operation process: 1, first clear the site in the Mainland table turf, humus and plant roots, then the natural foundation for RCC; requirements 1m below the surface of the soil-based compaction (heavy duty) not less than 85%. 2, with the excavator dug in the location of the foot embankment temporary drainage ditches (with the soil during the construction of ditches, until the end of preloading embankment, settlement and lateral displacement of stable, then mortar and stones). 3, the mixing section, completed after the gravel pile cushion, and then hydraulic fill embankment. 4, use of sand bags in preparation of construction of water retaining embankment berm location, its height should be high blowing sand, blowing at least should be higher than the levee height 30 ~ 50cm. Retaining embankment top width shall be not less than 1m, retaining embankment required a solid, without leaving empty areas to fill with sand embankment on both sides of farmland complete isolation. 5 Reclamation work began. Reclamation District, 40m long each set of discharge ports, located in the central cofferdam to discharge muddy water, if necessary, can be equipped with water pumps. 6, when the embankment height is less than 2m, to be a reclamation, when the embankment height greater than 2m should be layered back filling, layered back filling of the thickness of 1-2 meters. 7, hydraulic fill level control, measuring 30m × 30m stake to be set
 

下載地址

前往下載

麻豆精品久久久久久久99蜜桃| 国产一区二区三区在线观看视频| 91久久精品无码人妻系列| AV成人无码久久精品区一区二| 中文字幕日韩精品有码| 成人免费播放视频777777| 免费99精品国产自在在线| 2020国产精品久久精品| 丁香五月亚洲综合深深爱| 熟妇人妻无码中文字幕老熟妇| 国产精品18久久久久久vr| 国产午夜毛片v一区二区三区| 国产精品ⅴ无码大片在线看| 亚洲国产熟女一区二区三区| 欧美激情性爱片在线观看不卡| 亚洲第一综合天堂另类专| 97超碰人人人人人人少妇| av大尺度一区二区三区| 大地影视mv高清视频在线观看 | 丁香花视频在线观看| 久久这里只有精品免费| 50岁退休熟女露脸高潮| 日本一卡二卡四卡无卡国产| 最近2019中文字幕免费版视频8| 久久久精品国产亚洲av日韩| 国产精品午夜福利在线观看| 热久久美女精品天天吊色| 成全视频大全高清全集在线下载 | 国产制服丝袜无码视频| 亚洲欧美中文字幕5发布 | 春色福利导航| 国产a级毛片| 99久久精品日本一区二区免费| 人妻丰满熟妇AV无码片| 亚洲人成电影综合网站色www | 国产91色综合久久免费| 亚洲AV高清一区二区三区尤物| 久久精品国产亚洲av电影| 久久精品国产亚洲av热一区| 日本中文字幕不卡在线一区二区| 国产精品aⅴ视频在线播放|