室內(nèi)消防管道及設(shè)備安裝工藝技術(shù)交底.doc

更新時間: 2024-02-23
下載權(quán)限: 免費會員
文件大小: 0.02 MB
文件類型: .doc
瀏覽次數(shù):
上傳會員: 382957161
所屬欄目: 技術(shù)交底
進(jìn)入下載頁
資料簡介

交底內(nèi)容:
室內(nèi)消防管道及設(shè)備安裝
1  范圍
      本工藝標(biāo)準(zhǔn)適用于民用和一般工業(yè)建筑的室內(nèi)消防自動噴灑系統(tǒng)和消火栓系統(tǒng)的管道及設(shè)備安裝工程。
2  施工準(zhǔn)備
    2.1  材料要求:
    2.1.1  消防噴灑管材應(yīng)根據(jù)設(shè)計要求選用,一般采用鍍鋅碳素鋼管及管件,管壁內(nèi)外鍍鋅均勻,無銹蝕、無飛刺,零件無偏加、方扣、絲扣不全、角度不準(zhǔn)等現(xiàn)象。
    2.1.2  消火栓系統(tǒng)管材應(yīng)根據(jù)設(shè)計要求選用,一般采用碳素鋼管或無縫鋼管,管材不得有彎曲、銹蝕、重皮及凹凸不平等現(xiàn)象。
    2.1.3  消防噴灑系統(tǒng)的報警閥、作用閥、控制閥、延遲器、水流指示器、水泵結(jié)合器等主要組件的規(guī)格型號應(yīng)符合設(shè)計要求,配件齊全,鑄造規(guī)矩,表面光潔,無裂紋,啟閉靈活,有產(chǎn)品出廠合格證。
    2.1.4  噴灑頭的規(guī)格、類型、動作溫度應(yīng)符合設(shè)計要求,外型規(guī)矩,絲扣完整,感溫包無破碎和松動,易熔片無脫落和松動。有產(chǎn)品出廠合格證。
    2.1.5  消火栓箱體的規(guī)格類型應(yīng)符合設(shè)計要求,箱體表面平整、光潔。金屬箱體無銹蝕,劃傷,箱門開啟靈活。箱體方正,箱內(nèi)配件齊全。栓閥外型規(guī)矩,無裂紋,啟閉靈活,關(guān)閉嚴(yán)密,密封填料完好,有產(chǎn)品出廠合格證。
    2.2  主要機具:
    2.2.1  套絲機,砂輪鋸,臺鉆,電錘,手砂輪,手電鉆,電焊機,電動試壓泵等機械。
    2.2.2  套絲板,管鉗、臺鉗,壓力鉗,鏈鉗,手錘,鋼鋸,扳手,射釘槍,倒鏈、電氣焊等工具。
    2.3  作業(yè)條件:
    2.3.1  主體結(jié)構(gòu)已驗收,現(xiàn)場已清理干凈。
    2.3.2  管道安裝所需要的基準(zhǔn)線應(yīng)測定并標(biāo)明,如吊頂標(biāo)高、地面標(biāo)高、內(nèi)隔墻位置線等。
    2.3.3  設(shè)備基礎(chǔ)經(jīng)檢驗符合設(shè)計要求,達(dá)到安裝條件。
    2.3.4  安裝管道所需要的操作架應(yīng)由專業(yè)人員搭設(shè)完畢。
    2.3.5  檢查管道支架、預(yù)留孔洞的位置、尺寸是否正確。
    2.3.6  噴灑頭安裝按建筑裝修圖確定位置,吊頂龍骨安裝完按吊頂材料厚度確定噴灑頭的標(biāo)高。封吊頂時按噴灑頭預(yù)留口位置在頂板上開孔。
3  操作工藝
    3.1  工藝流程:
Cards on the table contents:
Fire service piping and equipment installation
1 Scope
      This technology is applicable to civil and general industrial building indoor fire sprinkler systems and fire hydrant system piping and equipment installation.
2 construction preparation
    2.1 Material Requirements:
    2.1.1 fire sprinkler pipe shall be selected according to design requirements, the general use of galvanized carbon steel pipe and pipe fittings, galvanized inside and outside wall of uniform, no rust, no flying stab, plus parts unbiased, side buttons, threaded incomplete perspective not allowed and so on.
    2.1.2 pipe hydrant system design requirements should be selected according to the general use of carbon steel pipe or seamless steel pipe, tubing, there is no bending, rust, heavy leather and rough and so on.
    2.1.3 fire sprinkler system, alarm valve, the role of valves, control valves, retarders, water flow indicator, pump combiners and other major components of the standard model should meet the design requirements, complete accessories, casting rules, smooth surface, no cracks, flexible and open and close, have a product factory certification.
    2.1.4 sprinkler head size, type, operating temperature should be consistent with design requirements, appearance rules, threaded integrity, temperature of non-broken and loose, easy to melt off and no loose pieces. Have a product factory certification.
    2.1.5 Hydrant box type should conform to the specifications of the design requirements, box smooth surface, bright and clean. Metal box no rust, scratches, door open and flexible. Founder box, box and complete accessories. Plug valve shape the rules, no crack, opening and closing a flexible, closed tight, sealed packing intact, the product factory certification.
    2.2 Main equipment:
    2.2.1 threading machine, wheel saws, bench drill, electric hammer, hand wheels, hand drills, welding machines, electric test pressure pump and other machinery.
    2.2.2 sets of silk panels, pipe wrench, vise, pressure clamp, chain pliers, hammers, hacksaw, wrench, firearm, down chain, Gas Welding and other tools.
    2.3 Operating conditions:
    2.3.1 Acceptance of the main structure has been the scene has been cleaned.
    2.3.2 Pipe Installation baseline needed to be measured and marked, such as ceiling elevation, ground elevation, location of lines within the walls.
    2.3.3 equipment meet the design requirements based upon testing, to installation conditions.
    2.3.4 installation of pipelines needed to operate aircraft should be completed professional erection.
    2.3.5 checking pipe support, reserve position of holes, size is correct.
    2.3.6 sprinkler head installed in accordance with building renovation plans determine the location, ceiling keel ceiling material installed thickness determined by spraying head elevation. Press the spray head ceiling closure reserve position in the roof on mouth opening.
3 Operation Process
    3.1 Process:
 

下載地址

前往下載

90后极品粉嫩小泬20p| 亚洲综合网国产精品一区| 谁有在线观看av中文| 久久久久久亚洲av无码专区| 欧美日韩国产在线观看免费| 伊大人香蕉久久网欧美| 亚洲精品久久7777777国产| 国产精品va在线观看无码不卡| 992tv国产人成在线观看| 日韩精品欧美精品中文精品| 成人国产片女人爽到高潮| 久热综合在线亚洲精品| 精品国产av最大网站| 日韩精品 在线 国产 丝袜| 久久伊人少妇熟女大香线蕉| 亚洲国产精品久久久久秋霞1| 一本色道精品久久一区二区三区| 成人永久福利在线观看不卡| 高清色本在线www| 婷婷色爱区综合五月激情| 99久久精品无码专区无| 国产免费丝袜调教视频| 蜜桃视频在线观看免费网址 | 三级国产在线观看| 18av千部影片| 日本久久久久| 国产一区二区三区不卡观| 奇米影视888欧美在线观看| 婷婷开心深爱五月天播播| 国产一区二区福利视频| 丁香花高清在线观看完整版电影| 五月天激情婷婷婷久久| 欧美中文字幕无线码视频| 国产亚洲av人片在线播放| 一个人免费观看的www| av无码一区二区三| 久久99精品久久只有精品| 中文字幕乱妇无码AV在线| 少妇久久久被弄到高潮| 在线观看国产三级av| 国产免费99久久精品|